{mouseover('img1')}"
@mouseout="()=>{mouseout('img1')}">
Description of Local Weather Forecast& Widget
Local weather forecast, your personal life assistant; provide accurate real-time weather, hourly forecast, daily forecast, radar map and all the weather forecast information you need.
****Main Features of Local Weather ****
✨ Real-time weather and Weather Alert
Affected area, start time, end time, alert summary, alert text, and data source. Alerts in different colors represent different levels.
✨ The next 24/72 hours weather forecast
Beautiful temperature curve graphics, each hour will provide temperature, Real feel temperature, weather briefing, humidity, UV index, visibility, Dew point, rainfall/snowfall/icing probability, wind direction/wind speed/wind level, cloud cover.
✨ The weather forecast for the next 10/25 days
Beautiful hyperbolic temperature change curve graph, providing daily maximum and minimum temperature, Real feel temperature, weather brief description, humidity, ultraviolet index, rainfall/snowfall/icing probability, lightning probability, wind direction/wind speed/wind level, sunrise/ Sunset time.
✨ Today's weather details
Provide Real feel temperature, sunrise and sunset, humidity, ultraviolet light, visibility, dew point, altitude, cloud cover.
✨ Air Quality Index
Air quality level and travel recommendations, specific indexes include PM10, PM2.5, carbon monoxide, carbon dioxide, sulfur dioxide, ozone, and quality level.
Provide explanations and suggestions for different levels of air quality index.
✨ Real-time weather radar cloud map
Can display a variety of radar cloud images, very convenient and quick to browse weather forecast information.
✨ City Management
Automatically locate the current location, provide manual addition and removal of cities, set the order of the city list; search for specified cities, and support fuzzy search.
✨ Theme style
Icons and backgrounds for different weather; notification bar styles with different layout styles; widget styles for different layout styles.
Support custom weather background, choose the picture on your mobile device.
✨ Weather information unit and format setting
Temperature unit、Precipitation units、Visibility units、Wind speed unit、Pressure unit、Hour format、Date format
✨ Suggestions and feedback
During the use process, any suggestions and comments can be directly fed back to us, or contact the e-mail address below.
✨ Support multiple languages
Download it now and experience the real-time and accurate weather forecast.
Life assistant, from now on to be with you.
In the course of use, if there are any questions or suggestions, please feedback to us at any time through the following mailbox, we will try our best to provide a better experience.
e-mail:
LifeAssistantStudio@outlook.com
Apps in the same category
Good App Guaranteed
This app passed the security test for virus, malware and other malicious attacks and doesn't contain any threats.
Local Weather Forecast& Widget - APK Information
APK Version: 1.4.9
Package: life.widget.accurate.channel.local.weather.forecast
Android compatability: 5.0+
Developer: Life Assistant Studio
Privacy Policy: https://sites.google.com/view/lifeassistantstudio
Name: Local Weather Forecast& Widget
Size:
Downloads: 1M
Version: 1.4.9
Release Date: Oct 28, 2023
Package ID: life.widget.accurate.channel.local.weather.forecast
Developer: Life Assistant Studio